MARK TSE
  • PROJECTS
    • DEUS
    • CISCO CX
    • HEALTH 2047
    • JOHN DEERE
    • O-BOX
    • PRE SALES TOOL
    • SAIC: MAXUS HMI
    • SAIC: NEXUS
    • VR GESTURE
  • CV
  • ARC
  • MI
  • STARLYTE
  • SYSDIG
  • xPLORATION
  • GAME ART
  • Blog
    • 3D/MOGRAPH
    • Z-BRUSH ANATOMY
    • Z-BRUSH TUTORIAL 01
    • Z-BRUSH TUTORIAL 02
    • Z-BRUSH TUTORIAL 03
    • AS A DESIGNER
    • C.A.T. LOGO
    • FORD IDEATION
    • GV DESIGN SPRINT VS APPLE
    • NEXON EXPERIENCE
    • SUB-SURFACE SCATTER
    • TESTIMONIAL VIDEOS

Hours

4.18.2025
6 hours
​
  • Plumbing in kitchen, garbage disposal connection to drain.
  • Side splash in kitchen.
  • Patch drywall



Picture
Connect hot and cold water, with drain. No leaking

  • Buy garbage disposal drain adapter $24 not on receipt
  • Buy drywall patch
  • Buy drain adapter 4 inches for 1 ½ drain pipe 9.99 on receipt
  • Buy wall patch filler putty for 5.99
  • Buy masking tape 7.89
  • Buy joint knife 7.59
  • Total 24+ 26 + 21.50-9.99 (return) = 61.50
disposal

Dumping : doors, countertop, trash $35
Picture
Picture
  • remove shower doors frame
  • Install curtain rack
Picture
Picture
4.16.2025
6 hours
  • Caulking of bathroom sink. No more drain leaks
  • Caulking of side splash and repaint touch ups






Picture
Picture

Total

$336 - 28/hr for total of 12 Hours
$61.50 parts
$67 dumping. small load

​$464.50

Mark Tse
​2016
  • PROJECTS
    • DEUS
    • CISCO CX
    • HEALTH 2047
    • JOHN DEERE
    • O-BOX
    • PRE SALES TOOL
    • SAIC: MAXUS HMI
    • SAIC: NEXUS
    • VR GESTURE
  • CV
  • ARC
  • MI
  • STARLYTE
  • SYSDIG
  • xPLORATION
  • GAME ART
  • Blog
    • 3D/MOGRAPH
    • Z-BRUSH ANATOMY
    • Z-BRUSH TUTORIAL 01
    • Z-BRUSH TUTORIAL 02
    • Z-BRUSH TUTORIAL 03
    • AS A DESIGNER
    • C.A.T. LOGO
    • FORD IDEATION
    • GV DESIGN SPRINT VS APPLE
    • NEXON EXPERIENCE
    • SUB-SURFACE SCATTER
    • TESTIMONIAL VIDEOS